Footway kept open through a six-week refurbishment
Southport · 6 weeks · Commercial. A sample project of a fictional firm.
Or call 77XXX12455
- 6 weekson site
- 42 mof footway kept open
- 0 daysthe shops were closed
- 1handover pack, on day one
Sample figures for a fictional firm.
Who it was for
A building contractor refurbishing the upper floors and the front of a three-storey building on a shopping street in Southport, with the shops on the ground floor trading throughout.
What we put up
A full-height scaffold along the 42-metre front, built to TG20, with a protection fan over the footway at first-floor level, lit hoarding at each end and a loading bay at the back, so nothing was lifted over the public.
What was hard
The footway had to stay open the whole time, the shop fronts had to stay visible, and deliveries came in from 6am. We put the scaffold up in two halves, on two early starts before the shops opened, and set the standards back from the shop doors so every entrance kept its full width.
What came of it
The shops traded every day of the six weeks, the licence ran without a complaint, and the scaffold came down on the Saturday the contractor had planned for. The handover pack, with the design, the inspection record and the tag, went to the site manager on the first day.