Safe, reliable scaffolding, priced clearly
Homes, builders and commercial sites. Send the postcode and a line about the job, and you get a price back — not a callback to arrange a callback.
Why customers choose us
-
Safety on every job
Built to TG20, tagged before use and inspected every seven days.
-
Itemised pricing
Erection, hire and dismantle priced separately. The price holds for 30 days.
-
23 years’ experience
Trading since 2003, with over 5,000 jobs behind us.
-
Same-day reply
An answer the same working day, a written quote within 24 hours.
-
Homes and sites
A tidy job for homeowners, the paperwork a site manager needs.
-
Fully insured
£10 million public liability, the certificate sent with every quote.
Our scaffolding services
Pick the job closest to yours and the quote form fills itself in.
-
Roof strip and re-tile
-
Chimney work
-
Rear extension
-
Loft conversion
-
Render and insulation
-
Temporary roof
-
Pavement licence work
-
Emergency make-safe Ring us, day or night
Also: gutters and fascias, edge protection, staircase and loading towers, shoring and propping, shop and office frontages, solar panel access.
Not on the list? Describe it on the form — it is almost certainly one we do.
Recent projects
What the job was, how big, how long it stood and when, so you can see whether we have done one like yours.
Front scaffold to a mid-terrace, pavement kept open
Roof and chimney access over a rear extension
Full sheeting on a tall corner building
Full frontage over a busy footway, cones on the kerb
Full elevation to a seafront hotel, with a stair tower
Experienced scaffolders, since 2003
We started in 2003 with one lorry, two scaffolders and a customer who came back. Twenty-three years on there are fourteen of us, and the owner still walks every job before it is priced.
We do this one trade and nothing else: no roofing, no building, no handing the erection to someone we have never met. That is why the crew on your job has usually worked together for years, and why the scaffold gets built the way it was priced.
Safety and compliance on every job
Four things a site manager asks for and a homeowner never thinks to. You get all four on every job, and none of them costs extra.
Public liability cover
£10 million, with the certificate sent with every quote. You don’t have to ask for it.
A handover pack
The TG20 compliance sheet, the loading limits, the tag record and a number to ring, in your hand before anyone climbs it.
Weekly inspection and a tag on the scaffold
Signed off in writing every seven days and after high wind. The tag shows the date of the last one.
Cards and training
Every scaffolder on the crew is CISRS-carded. Trainees work beside a card-holder, never on their own.
Customer feedback
Homeowners and site managers, in their own words.
Turned up when they said, boarded the ground lift every evening and left the drive as they found it. The price on the quote was the price on the invoice.
Helen · three-storey terrace · March
Second job with them. The inspection sheet is on my desk every Monday before I’ve had to ask.
Dave · site manager · rear extension · June
A slipped slate at 9pm on a Saturday and somebody answered the phone. It was made safe that night.
Priya · chimney stack · January
Clear, itemised pricing
Every quote is itemised in writing — erect, weekly hire, dismantle — so you can see what you’re paying for and compare it with anyone else’s.
A two-storey semi, front and back
Four weeks’ hire, tagging, weekly inspections and dismantling included. Extra weeks at the weekly rate printed on your quote. The price holds for 30 days.
How much of the building it goes round
A gable end is not a full perimeter, and a full perimeter is not four times a gable end.
How high, and how many lifts
Two storeys and three storeys are different jobs, not the same job scaled up.
How long it stands
Hire runs from the day it goes up. A job that overruns costs more than one that doesn’t.
Whether we can get to it
A back garden with no side access, a footpath licence, a live shop front — all of it adds.
Check we cover your area
Everything within 25 miles of our yard. If you’re outside it we’ll say so in ten seconds.
Request a written quote
The postcode, the job and your number go straight to whoever is pricing it, and you get a written price back.
Your questions answered
How long does it take to get a scaffold up?
A standard domestic job is usually half a day to a day on site once it is booked in. We are normally booking about a week ahead, and sooner for emergencies.
Do I need a licence if it goes over the pavement?
Yes — any scaffold on a public footpath or road needs a licence from the council, and it has to be in place before it goes up. We apply for it on your behalf, and the council’s fee is passed on at cost.
How long can I keep it up for?
As long as the job needs. Your quote includes the first four weeks; after that it is a flat weekly rate, printed on the quote, so you know what an overrun costs before it happens.
Is it safe to leave up while I’m away?
A scaffold is a ladder to your first floor, so the ground lift is normally boarded out or the ladder removed and the access blocked off at the end of each day. Ask for it if it matters to you.
Will it damage the drive, the path or the planting?
Base plates go on sole boards, which spread the load. Tell us on the form what is underneath and where the access is, and it gets planned round rather than discovered on the day.
Do you work with builders directly?
Yes. Pick “It’s a site” on the form and it asks for the things a site needs rather than the things a homeowner does.